1.Fast drilling speed – Equipped with a high‑efficiency rotary drilling system, it can advance 1–2 meters per minute in ordinary soil, greatly reducing the time needed to complete a single well.
2.Excellent cuttings removal – The optimized auger or mud circulation design quickly carries rock chips and sand out of the hole, minimizing re‑crushing.
3.Reduced stuck pipe risk – High torque output combined with a smooth debris discharge path effectively prevents the bit from being wrapped in sand and gravel.
4.Adaptable to various formations – From soft soil and clay to sandy layers and loose rock, it maintains stable drilling efficiency and good cuttings removal.
5.Fuel‑efficient and durable – The diesel engine is matched with an appropriate rotation speed, ensuring low fuel consumption even during long high‑speed drilling, lowering the cost of home well drilling.
6.Easy to operate – The lightweight wheeled design plus hydraulic assisted lifting allows one person to easily control the drilling rhythm and quickly move the rig for hole relocation and cuttings cleaning.
Product Parameters
This portable home-use small water well drilling rig (portable water well drilling rig for home use) features a lightweight body and flexible mobility, powered by a diesel engine (diesel powered water well drilling machine) with a wheeled structure (wheeled water well drilling rig) that allows one person to easily tow it to a yard, farm, or remote location. As a small water well drilling rig for sale, it supports drilling diameters of 80–200 mm and drilling depths of 30–60 meters, quickly meeting daily household needs such as drinking water and garden irrigation. Additionally, the rig requires no complex auxiliary equipment and can be deployed on-site within minutes, giving users in areas far from municipal water supplies easy access to clean groundwater.
| Overall Dimension | 100cm×100cm×245cm |
| Rig Weight | 290KG |
| Applicable Power Supply | 220V/380V/Gasoline Engine/Diesel Engine |
| Drilling & Crushing Method | Percussive-rotary Drilling |
| Water Pump Power | 2.2KW |
| Lifting Height | 2m (at the rig) |
| Drill Pipe Diameter | 50mm |
| Drill Pipe Length | 1.5m |
| Drill Pipe Connection Type | Threaded (Automatic Double Thread) |
| Motor Power | 4000W |
| Drilling Depth | 150m |
| Drilling Diameter | ≤500mm |
| Lifting Capacity | 2000KG |
Product details
1.Using branded diesel engines and equipped with electricstarting, it is easy to start and reduces the labor intensityof operators
2.The drilling rig adopts the hydraulic working principle andis equipped with a radiator, ensuring sustainable and efficientoperation of the rig
4.Good slag discharge effect, built-in water pump, reasonablestructure, compact layout.
5.The drilling rig is equipped with a hydraulic cylinder, whichcan be operated by a handle to increase and decreaseoil pressure.
Scope of application
This portable water well drilling rig for home use has a wide range of applications: it can be used in rural family yards and mountainous areas without municipal water supply, serving as a small water well drilling rig for sale to provide clean groundwater for daily drinking, washing vegetables, and laundry. Thanks to its diesel powered water well drilling machine, no external power source is required, allowing rapid well drilling and water access at outdoor campsites, farmland drought relief sites, greenhouse farming areas, or temporary construction camps. Its wheeled water well drilling rig design enables easy towing to villa gardens, vegetable patches, or small orchards, meeting year-round water needs for plant irrigation and crop cultivation. Furthermore, in the event of natural disasters or municipal water interruptions, it can serve as a core emergency backup water source, truly covering all decentralized, off-grid household and small-scale operational scenarios.
Instructions for Use
1.This drilling rig can be used with a household water pump, submersible pump, or direct tap water connection for circulation during drilling.
2.If you use a submersible pump for water circulation while drilling, it is recommended to dig two small pits next to the borehole: one for settling sand and sediment, and the other to place the submersible pump to serve as the circulation water source.
3.While drilling, add one section of drill pipe at a time as the hole goes deeper. When drilling is completed, lift the drill pipe and use the slot hole to lock the section that remains above ground, then detach the upper sections one by one to prevent them from falling back into the borehole.
4.After finishing the well, put some coarse sand or small crushed stones at the bottom to prevent muddy water during later pumping. It is strongly recommended to install the well casing as soon as possible after drilling to avoid borehole collapse. When installing the casing, drill small holes along the lower end of the pipe (covering a height of 50–100 cm); the denser the holes, the better the water flow will be.
Corporate Strength
Puhua Energy Equipment Technology (Shandong) Co., Ltd. is located in the Ninth Industrial Park, Jining High‑tech Zone, Shandong Province. Leveraging the region’s complete supply chain for construction and engineering machinery, the company has built an integrated production base covering R&D, final assembly, and quality inspection. Inside the factory, there is a standardized product assembly workshop and a dedicated commissioning line for small drilling rigs. From core component assembly to full machine testing of a portable water well drilling rig for home use, all processes are completed under one roof, eliminating unnecessary logistics transfers. The production line adopts a modular and flexible assembly mode, allowing quick and efficient switching between small water well drilling rig for sale and products from portable diesel water well drilling rig manufacturer. Combined with a sufficient finished‑goods inventory plan, common orders can be packed and shipped promptly upon placement. Thanks to the efficient component supply network and modern warehousing facilities within the Ninth Industrial Park, the company forms a highly effective closed‑loop internal flow from structural part pre‑treatment and hydraulic system assembly to durability testing. With dedicated order follow‑up and cooperation with international logistics partners, we ensure customs clearance and loading are arranged as soon as production is completed, meeting the strict delivery requirements of overseas customers. Moreover, the company holds full import/export qualifications and agency licenses, providing international buyers with one‑stop cross‑border procurement and customs clearance support. Our technical after‑sales team offers remote operation guidance and well‑drilling technical assistance. We sincerely welcome global customers to visit our factory in the Ninth Industrial Park, Jining High‑tech Zone, to witness in person every step from components to finished drilling rigs.
FAQ
1. What geological conditions is this drilling rig suitable for?
It is suitable for soft soil, clay, sandy layers, loose gravel layers, and some weathered rock formations. For hard rock, we recommend using an optional alloy drill bit or impact drilling tool.
2. Can it really be operated by one person?
Yes. The rig features a wheeled structure and lightweight design with a foldable handle. An average adult, after simple training, can easily tow, position, add drill pipes, and lift the drill string.
3. How long does it take to drill a well?
In ordinary soil, drilling to a depth of 30 meters takes about 1.5 to 2.5 hours (including auxiliary time). The actual time depends on the formation, hole diameter, and operator proficiency.
4. What are the drilling diameter and maximum depth?
The standard model drills holes of 80–200 mm in diameter and reaches a maximum depth of 60 meters. We can also customize deeper specifications (e.g., 100 meters) according to customer requirements.
5. How do I supply water while drilling?
You can use a household submersible pump, a regular water pump, or connect directly to tap water as the circulation medium. We recommend digging two small pits next to the borehole: one for settling sand and sediment, and the other to place the submersible pump to provide circulating water.
6. Do I need to install the casing immediately after finishing the well?
Yes. We strongly recommend installing the well casing as soon as drilling is completed to prevent borehole collapse. Before installing the casing, put coarse sand or small crushed stones at the bottom as a filter layer. The lower end of the casing should be pre‑drilled with holes (over a height of 50–100 cm); the denser the holes, the smoother the water flow.
7. What if the diesel engine is difficult to start?
Please check whether there is enough fuel, whether the oil level is normal, and whether the choke is in the correct position (the choke should be closed for a cold engine). If it still does not start, please contact our technical after‑sales team for video guidance.
8. How long is the delivery time? Do you support sea or air freight?
For standard stocked models, delivery can be made within 3 working days after payment. We have export qualifications and support sea freight (FCL/LCL) as well as air freight. We can also assist with customs clearance documentation.