1.Good disassembly, easy relocation and transportation.
2.Adopts dual-pump confluence system for fast drilling speed and high efficiency.
3.Equipped with linkage function for simple and flexible operation.
4.From the original manufacturer, strictly selected materials, resistant to wear and damage.
Product Introduction
A tunnel drilling rig, also known as a tunneling jumbo, is a hydraulic tunnel drilling rig that integrates multiple heavy hydraulic rock drills. It is specifically designed for rock tunnel drilling and underground drilling rig applications, making it the core equipment in the field of drill jumbo for tunnel construction. This type of tunnel boring equipment features a highly mobile crawler or tire-mounted chassis combined with a flexible boom positioning system, achieving exceptional drilling accuracy and efficiency in tunnel blast hole drill rig operations. It is widely used for drilling blast holes and systematic rock bolt holes. As a flagship product offered by a professional tunnel drilling rig manufacturer, it significantly increases excavation speed and reduces construction risks compared to traditional manual methods, making it an ideal choice to meet the demanding requirements of modern mining and tunneling projects for high-performance rock tunnel drilling equipment.3.
Product Parameters
| Item | unit | ZDY660 | ZDY1250S | ZDY1900S | ZDY3200S | ZDY4000S |
| Rated torque | N.m | 660 | 1250N.m | 1900N.m | 3200N.m | 4000N.m |
| Drilling depth | m | 150/100 | 300/200/100 | 300/200/100 | 300/200/100 | 350/200/100 |
| Drill pipe diameter | mm | 42/50 | 42/50/63.5 | 63.5/73 | 63.5/73 | 63.5/73 |
| Drilling angle | ° | ±90° | 0~±90° | 0~±90° | 0~±90° | 0~±90° |
| Rated Rotating speed | r/min | 50-300 | 50-250r/min | 50~270r/min | 50~210r/min | 50~280r/min |
| Pushing ability | KN | 27 | 36KN | 77KN | 77KN | 100KN |
| Pulling ability | KN | 40 | 52KN | 112KN | 112KN | 150KN |
| Push/Pull stroke | mm | 650 | 600 | 600 | 800 | 800 |
| Min. working height | mm | 1000 | 1000 | 1000 | 1000 | 1100 |
| Max. Working height | mm | 2100 | 2100 | 2100 | 2100 | 2100 |
| power | KW | 15 | 22KW | 37KW | 37KW/45KW | 55KW |
| Whole Machinery weight | kg | 1100kg | 1350kg | 2100kg | 2200KG | 2500kg |
| Drill machine weight | kg | 600kg | 800kg | 1250kg | 1200KG | 1500kg |
Product details
1.Liquid level gauge
It is convenient to monitor the oillevel to avoid equipment failurecaused by oil shortage
2.Hydraulic quick connector
Ensure the stable power transmissionof the drilling rig and guarantee thesmooth progress of the drillingoperation.
3.Pressure gauge
Help the operators monitor theworking status of the drilling rig toensure its stable operation
4.Power head component
The structure is stable, ensuringefficient power transmission
Application scenarios
1.Anchor drilling in engineering fields such as tunnels, subways, railways, and mines: particularly suitable for multi-angle drilling operations in tunnels, including horizontal, inclined, and vertical drilling. It offers fast drilling speed and high efficiency, capable of drilling 3 meters in 20 seconds.
2.Construction in complex rock formations and underground environments: when facing hard rock strata and complex underground conditions, tunnel drilling rigs must possess strong rock-breaking capabilities as well as precise and flexible all-position operation abilities to meet diverse construction requirements such as rock bolting, grouting, and pipe roofing within tunnels.
3.Different travel modes for different terrains: for example, crawler-type rigs are suitable for complex and uneven ground surfaces, while wheeled rigs facilitate rapid transfer within tunnels. These are applicable to various underground anchoring fields ranging from subways, culverts to underground parking lots.
4.Formation of ground reinforcement, cutoff walls, and advance support: the application of jet grouting rigs in tunnel construction is primarily reflected in ground reinforcement, the formation of cutoff walls, and advance support, providing strong technical support for the safety and smooth progress of tunnel construction.
Customer feedback
We have been using this hydraulic tunnel drilling rig on a challenging railway tunnel project, and the performance exceeded our expectations. For anchor drilling in tunnels, it handles horizontal, inclined, and vertical drilling with ease—reaching 3 meters in just 20 seconds. The crawler-type chassis provided excellent stability on uneven ground, while the rock-breaking capability allowed us to work efficiently in complex geological conditions. Whether for rock bolting, grouting, or pipe roofing, this tunneling jumbo delivered the precision and reliability we needed. It has become our go-to underground drilling rig for both mining and tunneling applications.
This customer feedback fully reflects the high recognition of our tunnel drilling rig products, and further confirms that Puhua Energy Equipment Technology (Shandong) Co., Ltd. maintains strict quality control over both technology and manufacturing. We always hold ourselves to high standards, delivering the most reliable and efficient products to every customer.
Corporate Strength
With over a decade of experience in the industry, Puhua Energy Equipment Technology (Shandong) Co., Ltd. is backed by a dedicated in-house manufacturing facility and warehouse, ensuring full control over production efficiency and inventory management. Our strength lies in independent R&D, enabling us to continuously innovate and tailor our tunnel drilling rigs to meet diverse project requirements. Combining technical expertise with rigorous quality standards, we are committed to delivering reliable, high-performance equipment to customers worldwide.
SHIPPING
Delivery time: 10-20 working days after payment receipt confirmed (based on actual quantity)Packing: standard export packing, or customized packing as your request.Professional goods shipping forwarder.
FAQ
Q1.Are you a manufacturer or Trader?
(1) We are a professional manufacture, we have our own R&D team and sales team, and we provide a one-stop service.
Q2.What Is your payment term?
2) .We accept T/T, L/C at sight, etc.
Q3.How long Is the valldity of the quotation?
3) .Generally, our price is valid within 15 days from the date of quotation. The price will be adjusted appropriatelyaccording to the price fluctuation of raw materials and changes in the market.
Q4.What Is your dellvery time?
4) Usually, we make merchandise inventory, if we have the products in stock, the delivery time is 5-10 days afterreceiving the deposit. If we don't have the products in stock, we will arrange the production right now, the delivery time wll
be 20-30 days, It depends on the order quantity.
Q5.Do you provlde OEM/ODM Servlce?
5) Yes, offer us the necessary information, we provide custom-made services to meet the different needs of globalclients with different budgets